Hackensack Meridian Health Network

CLIA Laboratory Citation Details

4
Total Citations
13
Total Deficiencyies
6
Unique D-Tags
CMS Certification Number 31D0679767
Address 1030 St Georges Ave, Avenel, NJ, 08820
City Avenel
State NJ
Zip Code08820
Phone732 750-1200
Lab DirectorGREGORY SHYPULA

Citation History (4 surveys)

Survey - March 24, 2026

Survey Type: Standard

Survey Event ID: CTO711

Deficiency Tags: D6029

Summary:

Summary Statement of Deficiencies D6029 LABORATORY DIRECTOR RESPONSIBILITIES CFR(s): 493.1407(e)(11) (e)(11) Ensure that prior to testing patients specimens, all personnel have the appropriate education and experience, receive the appropriate training for the type and complexity of the services offered, and have demonstrated that they can perform all testing operations reliably to provide and report accurate results; This STANDARD is not met as evidenced by: Based on surveyor review of the Personnel Files (PF) and interview with the Office Manager (OM), the Laboratory Director (LD) failed to have appropriate education documentation on all TP performing laboratory testing on 3/11/26. The finding includes: 1. The laboratory did not have education records for one out of five TP listed on the CMS form 209. 2. The OM confirmed on 3/24/26 at 12:00 pm the above record was not on file. Statement of Deficiencies (X1) Provider/Supplier/CLIA Identification Number (X3) Date Survey Completed Name of Provider or Supplier Street Address, City, State -- 1 of 1 --

πŸ”’ Unlock Deficiency Summary

Get full access to the detailed deficiency summary for this facility

One-time payment β€’ Lifetime access

Survey - May 7, 2024

Survey Type: Standard

Survey Event ID: S58H11

Deficiency Tags: D3037 D3037

Summary:

Summary Statement of Deficiencies D3037 RETENTION REQUIREMENTS CFR(s): 493.1105(a)(4) Proficiency testing records. Retain all proficiency testing records for at least 2 years. This STANDARD is not met as evidenced by: Based on surveyor review of Proficiency Testing (PT) records and interview with the Testing Personnel (TP), the laboratory failed to retain graded results for Hematology /coagulation PT events 2-2023 1-2023 performed with the American Proficiency Institute. The TP confirmed on 5/7/24 at 10:45 am that all PT graded results were not retained. Statement of Deficiencies (X1) Provider/Supplier/CLIA Identification Number (X3) Date Survey Completed Name of Provider or Supplier Street Address, City, State -- 1 of 1 --

πŸ”’ Unlock Deficiency Summary

Get full access to the detailed deficiency summary for this facility

One-time payment β€’ Lifetime access

Survey - April 18, 2023

Survey Type: Standard

Survey Event ID: 4NQE11

Deficiency Tags: D3037 D5401

Summary:

Summary Statement of Deficiencies D3037 RETENTION REQUIREMENTS CFR(s): 493.1105(a)(4) Proficiency testing records. Retain all proficiency testing records for at least 2 years. This STANDARD is not met as evidenced by: Based on surveyor review of Proficiency Testing (PT) records and interview with the Testing Personnel (TP), the laboratory failed to retain graded results for Hematology /coagulation PT events 3-2022, 2-2022 1-2022 performed with the American Proficiency Institute. The TP confirmed on 4/18/22 at 10:45 am that all PT graded results were not retained. D5401 PROCEDURE MANUAL CFR(s): 493.1251(a) A written procedures manual for all tests, assays, and examinations performed by the laboratory must be available to, and followed by, laboratory personnel. Textbooks may supplement but not replace the laboratory's written procedures for testing or examining specimens. This STANDARD is not met as evidenced by: Based on surveyor review of the Procedure Manual (PM), monthly Quality Control (QC) and interview with the Testing Personnel (TP), the laboratory failed to have a procedure for failed QC for Hematology testing from 8/2/5/19 to the date of survey. The findings include: 1) Two out of three levels of QC on controls failed on 2/23/22. 2) Control lot # 2221031 was run six times. 3) There were no

πŸ”’ Unlock Deficiency Summary

Get full access to the detailed deficiency summary for this facility

One-time payment β€’ Lifetime access

Survey - August 15, 2019

Survey Type: Standard

Survey Event ID: 9CGD11

Deficiency Tags: D5401 D6029 D6074 D6074 D5805 D5403 D5805 D6029

Summary:

Summary Statement of Deficiencies D5401 PROCEDURE MANUAL CFR(s): 493.1251(a) A written procedures manual for all tests, assays, and examinations performed by the laboratory must be available to, and followed by, laboratory personnel. Textbooks may supplement but not replace the laboratory's written procedures for testing or examining specimens. This STANDARD is not met as evidenced by: a. Based on surveyor review of the Procedure Manual (PM), calibration records, and interview with the Nurse Manger (NM), the laboratory failed to follow the procedure for calibration of the Medonic analyzer from 11/30/18 to the date of survey. The finding includes: 1. The PM maintenance and calibration schedule stated calibration was due in month 6 and 12 but the laboratory had no record of calibration after 11/30 /18. 2. The NM confirmed on 8/15/19 at 1:15 pm that the laboratory did not follow the calibration procedure. b. Based on surveyor review of the PM, lack of

πŸ”’ Unlock Deficiency Summary

Get full access to the detailed deficiency summary for this facility

One-time payment β€’ Lifetime access