Metropolitan Gastroenterology Pc

CLIA Laboratory Citation Details

1
Total Citation
2
Total Deficiencyies
2
Unique D-Tags
CMS Certification Number 33D1020167
Address 23-25 31st Street, Suite 700, Astoria, NY, 11105
City Astoria
State NY
Zip Code11105
Phone(718) 932-6000

Citation History (1 survey)

Survey - August 23, 2018

Survey Type: Standard

Survey Event ID: FNRV11

Deficiency Tags: D5433 D6094

Summary:

Summary Statement of Deficiencies D5433 MAINTENANCE AND FUNCTION CHECKS CFR(s): 493.1254(b)(1) For equipment, instruments, or test systems developed in-house, commercially available and modified by the laboratory, or maintenance and function check protocols are not provided by the manufacturer, the laboratory must establish a maintenance protocol that ensures equipment, instrument, and test system performance that is necessary for accurate and reliable test results and test result reporting. The laboratory must perform and document the maintenance activities specified in paragraph (b)(1)(i) of this section. This STANDARD is not met as evidenced by: Based on a review of the laboratory procedure manual and an interview with the laboratory director via telephone, the laboratory failed to have a complete maintenance protocol or procedure for histopathology. Findings Include: On August 23, 2018, at approximately 1:20 pm, it was confirmed by the laboratory director via telephone that the laboratory failed to follow their procedures and perform yearly microscope maintenance when it was due in January 2018. D6094 LABORATORY DIRECTOR RESPONSIBILITIES CFR(s): 493.1445(e)(5) The laboratory director must ensure that the quality assessment programs are established and maintained to assure the quality of laboratory services provided and to identify failures in quality as they occur. This STANDARD is not met as evidenced by: Statement of Deficiencies (X1) Provider/Supplier/CLIA Identification Number (X3) Date Survey Completed Name of Provider or Supplier Street Address, City, State -- 1 of 2 -- Based on a review of procedures and confirmed in an interview with the laboratory director, the director failed to follow the laboratory procedure to perform yearly microscope maintenance due January 2018. Refer to: D5433 -- 2 of 2 --

πŸ”’ Unlock Deficiency Summary

Get full access to the detailed deficiency summary for this facility

One-time payment β€’ Lifetime access