Reliance Pathology Partners Llc

CLIA Laboratory Citation Details

2
Total Citations
3
Total Deficiencyies
3
Unique D-Tags
CMS Certification Number 10D1038878
Address 516 Vonderburg Dr, Brandon, FL, 33511
City Brandon
State FL
Zip Code33511
Phone(813) 654-7771

Citation History (2 surveys)

Survey - January 13, 2025

Survey Type: Standard

Survey Event ID: SSXX11

Deficiency Tags: D3001 D0000

Summary:

Summary Statement of Deficiencies D0000 An announced CLIA recertification survey was conducted at Reliance Pathology Partners LLC on 01/13/2025. The laboratory is not in compliance with 42 CFR Part 493, Requirements for Laboratories. D3001 FACILITIES CFR(s): 493.1101(a)(1) (a) The laboratory must be constructed, arranged, and maintained to ensure the following: (a)(1) The space, ventilation, and utilities necessary for conducting all phases of the testing process. This STANDARD is not met as evidenced by: Based on observations and interview the laboratory failed to ensure an adequate ventilation system to remove vapors and fumes. Findings include: 1. During the laboratory tour on 01/13/2025 at 9:55 AM to 10:35 AM, a gallon jug of Reagent Alcohol with a label/pictogram with the words "FUME HOOD" was observed. A tissue processing and staining work station was present. No fume hood was present. Photographic evidence was taken. 2. Interview with the Lead Technologist on 01/13 /2025 at 10:35 AM confirmed the lab utilized the Reagent Alcohol and did not have a fume hood. Statement of Deficiencies (X1) Provider/Supplier/CLIA Identification Number (X3) Date Survey Completed Name of Provider or Supplier Street Address, City, State -- 1 of 1 --

πŸ”’ Unlock Deficiency Summary

Get full access to the detailed deficiency summary for this facility

One-time payment β€’ Lifetime access

Survey - June 19, 2018

Survey Type: Standard

Survey Event ID: X38R11

Deficiency Tags: D5429

Summary:

Summary Statement of Deficiencies D5429 MAINTENANCE AND FUNCTION CHECKS CFR(s): 493.1254(a)(1) For unmodified manufacturer's equipment, instruments, or test systems, the laboratory must perform and document maintenance as defined by the manufacturer and with at least the frequency specified by the manufacturer. This STANDARD is not met as evidenced by: Based on maintenance log record review and interview with the Histotechnologist, the laboratory failed to document cleaning for the cryostat and microscope for two out of two years reviewed (2017-2018). Findings included: A review of the maintenance logs revealed no documentation of cleaning of the cryostat and microscope for two out of two years (2017 - 2018). An interview on 06/19/18 at 12:15 pm with the Histotechnologist confirmed that documentation had not been made for cleaning the cryostat and microscope for two out of two years (2017-2018). Statement of Deficiencies (X1) Provider/Supplier/CLIA Identification Number (X3) Date Survey Completed Name of Provider or Supplier Street Address, City, State -- 1 of 1 --

πŸ”’ Unlock Deficiency Summary

Get full access to the detailed deficiency summary for this facility

One-time payment β€’ Lifetime access