Summary:
Summary Statement of Deficiencies D0000 An announced CLIA recertification survey was conducted at Reliance Pathology Partners LLC on 01/13/2025. The laboratory is not in compliance with 42 CFR Part 493, Requirements for Laboratories. D3001 FACILITIES CFR(s): 493.1101(a)(1) (a) The laboratory must be constructed, arranged, and maintained to ensure the following: (a)(1) The space, ventilation, and utilities necessary for conducting all phases of the testing process. This STANDARD is not met as evidenced by: Based on observations and interview the laboratory failed to ensure an adequate ventilation system to remove vapors and fumes. Findings include: 1. During the laboratory tour on 01/13/2025 at 9:55 AM to 10:35 AM, a gallon jug of Reagent Alcohol with a label/pictogram with the words "FUME HOOD" was observed. A tissue processing and staining work station was present. No fume hood was present. Photographic evidence was taken. 2. Interview with the Lead Technologist on 01/13 /2025 at 10:35 AM confirmed the lab utilized the Reagent Alcohol and did not have a fume hood. Statement of Deficiencies (X1) Provider/Supplier/CLIA Identification Number (X3) Date Survey Completed Name of Provider or Supplier Street Address, City, State -- 1 of 1 --