Summary:
Summary Statement of Deficiencies D5417 TEST SYSTEMS, EQUIPMENT, INSTRUMENTS, REAGENT CFR(s): 493.1252(d) Reagents, solutions, culture media, control materials, calibration materials, and other supplies must not be used when they have exceeded their expiration date, have deteriorated, or are of substandard quality. This STANDARD is not met as evidenced by: Based on a review of the Sickle-Chek Quality Control (QC) records, the Sickle-Chek patient log, the Sickle-Chek Information For Use (IFU) and an interview with Testing Personnel #1, the laboratory utilized expired Sickle-Chek QC prior to patient testing. The surveyor noted one patient was performed using expired Sickle-Chek QC in 2024. The findings include: 1. A review of the Sickle-Chek QC records revealed the Sickle-Chek QC was opened 3/20/24 and expired 6/28/24, one patient was performed on 8/5/24. 2. A further review of the Sickle-Chek IFU revealed, "Sickle-Chek...Open- vial stability is 100 days after opening." 3. During the exit interview on 8/20/2024, at 2:35 PM, Testing Personnel #1 confirmed the above findings. D5429 MAINTENANCE AND FUNCTION CHECKS CFR(s): 493.1254(a)(1) For unmodified manufacturer's equipment, instruments, or test systems, the laboratory must perform and document maintenance as defined by the manufacturer and with at least the frequency specified by the manufacturer. This STANDARD is not met as evidenced by: Based on a review of the Hematology maintenance records and an interview with the Laboratory Manager, the Laboratory failed to document monthly maintenance on the Beckman Coulter DxH 690 T Hematology analyzer as per the manufacturer's Statement of Deficiencies (X1) Provider/Supplier/CLIA Identification Number (X3) Date Survey Completed Name of Provider or Supplier Street Address, City, State -- 1 of 2 -- requirements. This was noted for three of eight months reviewed in 2024. The findings include: 1. A review of the Beckman Coulter DxH 690 T Hematology analyzer records revealed no documentation of monthly maintenance in April, May, and June of 2024. 2. During an interview on 8/20/24, at 1:30 PM, the Laboratory Manager confirmed the above findings. D5781